[email protected] Request Quote

In Pit Crusher Capacity

2009-10-15 for a smipcc crusher there is no reduction in operating time at the crusher whilst a shovel manoeuvres, provided that either the feed bin capacity is sufficient to cover any lost time, or as is generally more likely that the crusher is fed by two shovels and the risk of them both manoeuvring at the same time is reduced.

Get Price List

Latest News